
Minister for Communications Abdul Aleem Khan has directed the National Highways Authority to expedite renovation, maintenance, and rehabilitation work on the Lowari Tunnel.
Presiding over a meeting in Chitral today, he also directed that the pace of ongoing development work on the N-45 highway in Chitral be accelerated.
The Minister said that the Lowari Tunnel is not only an important link connecting Dir and Chitral but is also of great importance to the province of Khyber Pakhtunkhwa.
He expressed concern over delays in the Mastuj and Shandur road projects, as well as the Chitral-Kalash Road project.
He also stressed the need to accelerate the pace of work and ensure its quality on the 309-kilometre-long national highway connecting Nowshera with Chitral.
He further directed the NHA to ensure the provision of ambulance, rescue, and CCTV facilities at the Lowari Tunnel.
Abdul Aleem Khan directed the authorities to complete the construction work on the Lowari Tunnel as soon as possible, emphasising that no compromise would be made on the quality and durability of the work.
He also instructed the authorities to develop rest areas, cafeterias, and other facilities near the tunnel to facilitate tourists.
The Minister was informed that the Lowari Tunnel comprises two tunnels with a combined length of more than ten kilometres, while various NHA development and construction projects worth 33 billion rupees are currently underway.
Earlier, Minister for Communications Abdul Aleem Khan visited the Lowari Tunnel where he conducted a detailed review of ongoing NHA development and construction work and inspected the interior and exterior sections of the tunnel.